Kilmer Ridge — Phase 2 · prepared for for adjudication & arbitration.
Simulated data. Every capture in this demo is
origin: "simulated" — invented, not recorded on a jobsite. These
pages show how a productivity factor is derived. No model-accuracy
figure is reported anywhere: simulated captures may train a model and may never
measure one, so an accuracy number computed here would be meaningless.
Traceability: All 2 figures resolve to their source capture and hours rows.
Provisional format. Provisional format. BC's Construction Prompt Payment Act regulations were still in consultation as of mid-2026 — no in-force date and no designated adjudication authority announced. Treat the layout as a working draft to revise once the regulations land, not a filing-ready form.
BC adjudication export
Kilmer Ridge — Phase 2 · 2200 Kilmer Road, Surrey,
BC · data region ca-central-1